What this work involves
Define the supplied finish level and responsibilities for foundations, transport, assembly, services and facade work.
- Shell or finished package
- Transport and lifting space
- Moisture, air and thermal junctions
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate disruptive structural phases with temporary use of the home.
What the drawing needs to explain
Create a phase plan showing work zones, usable rooms and bathroom access. Identify temporarily unavailable facilities and their replacements.
Decide this before construction
Link each order date to the phase needing the component. Before a disruptive transition, check that materials, decisions and temporary facilities are actually available.
Cost factors for this service
Costs depend on element size, finish level, transport and connection work. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for timber frame & prefabricated elements. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging timber frame & prefabricated elements?
Prefabricated does not automatically mean turnkey. Compare exactly which tasks are included in supply and assembly.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.