What this work involves
Assess the condition of bricks and joints. The new mortar needs to be compatible with the existing masonry.
- Existing joint condition
- Joint profile and colour
- Sample panel and repair extent
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate disruptive structural phases with temporary use of the home.
What the drawing needs to explain
Create a phase plan showing work zones, usable rooms and bathroom access. Identify temporarily unavailable facilities and their replacements.
Decide this before construction
Link each order date to the phase needing the component. Before a disruptive transition, check that materials, decisions and temporary facilities are actually available.
Cost factors for this service
Costs depend on facade area, joint repairs, access and protection. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for repointing & masonry joints. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging repointing & masonry joints?
Repointing alone will not resolve an underlying moisture or movement problem. Have possible causes investigated alongside the repair.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.