What this work involves
Work from final supplier dimensions and service drawings. Establish responsibility for worktops, appliances and reinstatement.
- Final kitchen layout
- Service points and appliances
- Worktop, plinths and handover
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Schedule final finishes once the work zone is clear of disruptive work.
What the drawing needs to explain
Create a phase plan showing work zones, usable rooms and bathroom access. Identify temporarily unavailable facilities and their replacements.
How to review the result
Do not close a phase only on paper. Check whether the space is usable again and which outstanding items affect the next phase or everyday family life.
Cost factors for this service
Costs depend on layout, installation scope, appliances and alterations. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for kitchen fitting & installation. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging kitchen fitting & installation?
Fitting and building preparation are often separate items. Check whether pipework, wall finishes and floor repairs are included.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.