What this work involves
Establish existing service routes, levels, ground conditions and access before planning excavation.
- Excavation boundaries
- Removal and reuse of soil
- Levels and surrounding connections
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate disruptive structural phases with temporary use of the home.
What the drawing needs to explain
Create a phase plan showing work zones, usable rooms and bathroom access. Identify temporarily unavailable facilities and their replacements.
Decide this before construction
Link each order date to the phase needing the component. Before a disruptive transition, check that materials, decisions and temporary facilities are actually available.
Cost factors for this service
Costs depend on soil volume, access and disposal arrangements. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for groundworks & site preparation. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging groundworks & site preparation?
Even a small extension may need groundworks. Foundation design, existing landscaping and service routes determine the extent.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.