What this work involves
Do not disturb suspect material. Establish the survey, notifications and qualified contractors required for the particular situation.
- Survey report
- Scope and qualified contractor
- Clearance and subsequent scheduling
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Link decision dates, deliveries and use restrictions in one phase programme.
What the drawing needs to explain
Create a phase plan showing work zones, usable rooms and bathroom access. Identify temporarily unavailable facilities and their replacements.
Decide this before construction
Link each order date to the phase needing the component. Before a disruptive transition, check that materials, decisions and temporary facilities are actually available.
Compare the complete intervention
Include temporary kitchen facilities, protection and any extra moves. A programme with more phases may require more setup and clearing work than continuous construction.
Cost factors for this service
Costs depend on investigation, material type, access and removal scope. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for asbestos surveys & removal planning. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging asbestos surveys & removal planning?
The required process depends on materials and work. No in-house asbestos certification is claimed; the appointed specialist must be confirmed beforehand.
Official background: Dutch Government (Dutch).
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.